Dishwasher Installation
A dishwasher install involves plumbing, electrical, and leveling -- each step has a gotcha that causes callbacks. The drain knockout, the high loop, and testing before final push-in are the three steps most people skip.
A Geek handles the full installation: supply line, drain, electrical, leveling, and a test cycle before we leave. $149.99.
Garbage disposal knockout plug: still in. Dishwasher runs. Water backs up into dishwasher. Knockout plug: still in.
Before you start:
- •Turn off both water and power before starting -- dishwasher installation involves both simultaneously
- •Remove the garbage disposal knockout plug before connecting the drain hose -- forgetting this is the most common 'dishwasher won't drain' call
- •Check local code for air gap requirement -- California and several states require an air gap device, not just a high loop
- •Test all connections before pushing the dishwasher into final position -- fixing a supply line leak is much harder after installation
- •Use a stainless braided supply line -- rubber and plastic lines crack over time and cause major water damage
What you'll need
Needed for water supply connection at the inlet valve and drain connection at the air gap or sink drain. Hand-tight plus 1/4 turn is correct -- overtightening plastic fittings cracks them.
Required on all threaded water supply connections to prevent slow leaks. 2--3 wraps clockwise (so the tape doesn't unwind when you thread the fitting).
Most dishwashers hardwire to a junction box under the counter rather than plugging into an outlet. Secure wire connections are non-negotiable for a water-adjacent electrical connection.
The dishwasher must be level side-to-side for the door latch to work correctly. Adjust the front leveling feet before securing the mounting brackets.
If the drain line must pass through a cabinet wall, a 1/2" hole is required. Most installations have an existing knockout -- check before drilling.
The steps
Shut off water and power before touching anything
Connect the water supply line to the inlet valve
Route the drain line with a high loop or air gap
Make the electrical connection at the junction box
Level, secure to cabinet, and test before closing it in
Installed and tested
Supply connected, drain routed correctly, power wired, leveled, test cycle completed. No leaks when we leave.
From $149.99
Same-day available · Satisfaction guaranteed
By the numbers
Installed dry. Draining correctly. Working before we leave.
The three things that cause dishwasher installation callbacks: the drain knockout not removed, the high loop skipped, and not testing before final push-in. We don't skip any of them.
Supply connected, drain routed, power wired, test cycle run. Done.
